Asia Pacific Data Centre Construction Cost Guide 2025

James Normandale • 16/01/2025

Our 2025 report provides a comprehensive analysis of both land purchase and data centre construction costs to assist data centre operators, developers, investors and lenders looking to better understand the sector’s capital requirements.

Drawing on Cushman & Wakefield data from 90 clusters across 26 data centre locations, the report provides detailed modelling and cost scenarios along with insights into key themes influencing the sector’s development: power availability and cost, AI, and investment trends.

Data Centre Construction Costs

Data centre construction costs continued to rise in 2024, albeit more slowly than in prior years as supply chain stress continued to ease. Regionally, construction cost inflation of 3.8% off last year’s record high base reflected ongoing demand within the sector.

Only India and Australia saw the rate of construction inflation increase, in both cases primarily driven by strong demand from both local and international players. In all other markets, the rate of inflation has slowed or plateaued as demand/supply for materials reconciles into post-pandemic norms.

India, Australia and Indonesia saw the greatest increase in construction costs (5%) while Hong Kong, China saw the slowest rate of inflation (2.1%).

The top five most expensive construction markets have remained unchanged from last year, albeit ranked differently.

 

Most Expensive Markets

(ranked by mid-range cost and based on a mid-specification build)

  1. Japan
  2. Singapore
  3. Australia
  4. South Korea
  5. Greater China, Hong Kong

Land Purchase Costs*

Land costs continued to rise in 2024 as an increasing scarcity of powered sites suitable for data centre construction in established markets drove interest in emerging markets. This scarcity of land has encouraged a move towards innovative redevelopment of brownfield sites.

*Note that our methodology for calculating land costs has changed to reflect cluster pricing rather than market pricing; year-on-year comparisons are not available.

Most Expensive Clusters

(ranked by mid-range land)

Inner City Clusters

  1. Gangnam, Seoul, South Korea
  2. Neihu District, Taipei, Taiwan China
  3. Central Tokyo, Greater Tokyo, Japan
  4. Central Jakarta, Greater Jakarta, Indonesia
  5. South West Seoul, Seoul, South Korea
 
 
Outer CBD Fringe Clusters
  1. Kawasaki, Greater Tokyo, Japan
  2. Sha Tin, Hong Kong, Greater China
  3. Seongnam, Seoul, South Korea
  4. Fanling, Hong Kong, Greater China
  5. Sagamihara, Greater Tokyo, Japan

related insights / news

Cushman & Wakefield wins Data Centre Market Intelligence Award at Asia Pacific W.Media Awards.jpg
Cushman & Wakefield wins Data Centre Market Intelligence Award at Asia Pacific W.Media Awards

Cushman & Wakefield is pleased to announce it has been named winner in the Data Centre Market Intelligence Team category at this year’s W.Media Awards in Singapore.

Amy Kathleen Kelly • 10/12/2024

Insights

$name

Insights

$name

CAN'T FIND WHAT YOU'RE LOOKING FOR?

Get in touch with one of our professionals.

クッシュマン・アンド・ウェイクフィールドでは、トラフィックの分析および本ウェブサイト上でベストの体験をお客様に提供するためクッキーを使用します。このダイアログを閉じ、お客様の同意を確認されるか、詳細については次のページを訪れてください:
クッキー通知

その他のオプション
同意する
これらのクッキーにより、当社のウェブサイトが期待通りに動作することが保証されます。例えば、ウェブサイトのトラフィック負荷を当社のサーバー間で分散し、使用量が特に多いときにウェブサイトがクラッシュしないようにします。
これらのクッキーは、お客様が行った選択(ユーザー名、言語、居住地域など)をウェブサイトに記憶させ、より充実した機能を提供するためのものです。これらのクッキーは、広告に使用される可能性のあるお客様の情報を収集したり、お客様がインターネット上でどこにいたかを記憶したりすることはありません。
これらのクッキーは、当社がマーケティングパートナーと協力して、お客様が当社のウェブサイトに訪問する前にどの広告やリンクをクリックしたかを理解したり、当社の広告をお客様にとってより適切なものにするために使用されます。
すべてに同意する
すべてを拒否する
設定の保存